Citywide Base Timing Update Project

Cost: $500k
I have been the Transportation Engineer in charge of the hiring and working with a consultant to study our existing traffic signal timing and evaluate the basic timing for minimum green times for bikes, yellow intervals, flashing don’t walk times, and emergency vehicle preemption timing to over 140 signalized intersections. I am currently working on reviewing the first deliverable provided by the consultant and will provide city comments and aim to have citywide timing parameters that meet current MUTCD requirements and deliver a safer signal system to the users of the system.