PWC 8787 Fremont Blvd/Eggers Intersection Improvements Project

Cost: $500k
I completed the design plans, specifications, and Engineer’s estimate for the traffic signal and SIC and fiber optic systems of this high profile project. This project has required a lot of coordination with our Design and Survey departments, PG&E, and signal pole manufactures. One issue was a conflict with a proposed pole location with existing utilities. I was able to evaluate alternatives, make sound recommendations and prepare effective technical drawings to provide our construction department and contractor. I was able to locate the right size mast arm quickly to be able to accommodate this major field change. I collaborated with construction and design to resolve issues, go out to the field to meet with City inspectors and contractors, and do my best to ensure a smooth construction of our signal system with minimal delays to this project.